Sylvie L.’s Garage
Completed in November 2023 in Lachine
A complete upgrading of her garage to solve both insulation problems on the ceiling and exterior wall, and storage problems of all kinds.
Re-insulating the ceiling and exterior wall. Replacing the heating and lighting units and adding electrical outlets. Pulling the joints. Painting the whole garage. Polyaspartic coating of floor, cement foundation and baseboards.
Designing, fabricating and installing bespoke melamine furniture, incorporating a workbench with solid coloured beech countertop. Supplying and installing log racks, wall organizing PVC slatwall surfaces, automatic hose reel, swiveling bike racks and a hitch for the bike carrier.
Type
Surface Area
Budget
General work: Les Entreprises Pierre Vivier | Electrical work: Brault Électrik | Painting work: Les peintres Pro-Design | Polyaspartic coating of floor, cement foundation and baseboards: Polyfloor | Bespoke melamine furniture: Cuisines Beaucage | Solid coloured beech countertop: Bizier | PVC slatwall panels: CrownWall | Automatic hose reel: Gardena | Wall-organizing steel accessories : HandiSOLUTIONS | Bike rack hitch: StoreMyBoard | Swiveling bike rack: Steady Rack | Installation work: Espace Garage Plus

Audrey’s Garage