Marie-Claude’s Garage
Completed in July 2022 in Kirkland
A complete renovation and a new design transforming her garage with plenty of turnkey storage solutions.
Insulating and finishing the baseboards, replacing the existing staircase, repairing walls and ceiling, adding an access hatch and replacing the steel side door. Completely redesigning the electricity adding LED lighting, electrical vehicle charging station and new garage door openers. Painting the whole garage. Polyaspartic covering of staircase, baseboards and floor and adding a checker plate aluminum drain cover.
Designing, fabricating and installing bespoke matte polymer furniture with solid coloured beech countertops. Supplying and installing overhead storage racks, wall-organizing PVC slatwall panel surfaces and automatic hose box.
Type
Surface Area
Budget
General work: Les Entreprises Pierre Vivier | Electrical work: Lilco | Painting work: Les Peintres Pro-Design | Polyaspartic floor, staircase and wall covering work: Polyfloor | Checker plate aluminum drain cover: SL Aluminium | Bespoke laminate furniture: Cuisines Beaucage | Solid coloured beech countertops: Bizier | PVC slatwall panels: HandiSOLUTIONS | Wall-organizing steel accessories: HandiSOLUTIONS | Overhead storage racks : Onrax | Installation work : Espace Garage Plus

Laurentiu’s Garage